Thumbnail image of Flood Design Verification Report - N2NS - Phase 1

Flood Design Verification Report – Narrabri to North Star Phase 1

This report assesses flood behaviour within the local catchments crossed by the project, within the Namoi, Gwydir and Macintyre River basins, including estimates of flood levels and velocities for existing and design conditions. Due to the large file sizes of the technical reports appended to this document, only the main body of the report is available online.

Updated: July 22, 2022


Download

File size: 13Mb

Please contact us if any content within this document is inaccessible. If you need help with reading this document, or if English is your second language, please call 131 450. This is a free service.