April 1, 2024

Working with Inland Rail – key activities explained

This brochure explains the roles, rights and responsibilities of both Inland Rail and impacted NSW landowners, as part of the Inland Rail project.

April 1, 2024

EBPC Annual Compliance Report 2024

This report details the commitments outlined within EPBC 2016/7729 and assessment of compliance against conditions 1 - 12 for the reporting period 10 April 2023 to 9 April 2024 as per Condition 6 of EPBC 2016/7729.

October 1, 2023

Narrabri to North Star Phase 1: Operational Staging Report

This Staging Report has been prepared to describe Inland Rail's staged approach to construction and operation of the Narrabri to North Star Phase 1 section.

June 21, 2023

Narrabri to North Star Phase 2 Community Reference Group: 21 June 2023 Meeting Minutes

Official meeting minutes of the Narrabri to North Star Phase 2 Community Reference Group meeting held on 21 June 2023.

October 11, 2023

Narrabri to North Star Phase 2 Community Reference Group: 11 Oct 2023 Meeting Minutes

Official meeting minutes of the Narrabri to North Star Phase 2 Community Reference Group meeting held on 11 October 2023.

December 6, 2023

Narrabri to North Star Phase 2 Community Reference Group: 6 Dec 2023 Meeting Minutes

Official meeting minutes of the Narrabri to North Star Phase 2 Community Reference Group meeting held on 6 December 2023.

March 27, 2024

Narrabri to North Star Phase 2 Project Update – March 2024

In the last two months, we have been consulting with residents near the rail line in Moree, north of Alice Street, about potential impacts from noise once Inland Rail becomes operational.

March 14, 2024

Narrabri to North Star Phase 1 project: Six Monthly Construction Monitoring Report (May-October 2023)

This six monthly construction monitoring report summarises the results of Narrabri to North Star Phase 1 construction monitoring programs for the period of May and October 2023.

March 1, 2024

First GrainCorp train to use upgraded line north of Moree

Another major milestone has been reached on the Narrabri to North Star section of Inland Rail with the first GrainCorp train in more than six years traveling on the track north of Moree, to load canola from the GrainCorp silos in Croppa Creek (around 60km northeast of Moree).

February 20, 2024

Narrabri to North Star Phase 2 PIR Noise Mitigation Options Assessment Report

This report was prepared as a response to the NSW Planning Secretary’s request for a Preferred Infrastructure Report (PIR) with a section assessing noise mitigation options. It specifically addresses the following request: "Assess and prepare a report on the effectiveness and feasibility of potential noise mitigation measures including at-source barriers (including noise walls and wheel walls), at-property noise mitigation and other alternative options for residences in Moree bounded by the Gwydir Highway, Newell Highway, Oak Street and River Street."