No. 102: Bogan Road single lane extended

As part of these works, we have been upgrading the level crossing at Bogan Road, Goonumbla. Due to continued wet weather, opening Bogan Road back to two-way has been delayed. We apologise for any inconvenience.

No. 102: Bogan Road single lane extended

Snapshot

Date

April 2024

Local Government Area

Timing and location of works

Bogan Road, Goonumbla

  • In mid-August 2020, Bogan Road will be re-opened to two-way traffic.

What we’re doing

  • Building road formation
  • Installing permanent fencing and signage
  • Upgrading road drainage
  • New seal and line-marking
  • Landscaping / revegetation works.

What to expect

  • A speed reduction to 40km/h will be in place several hundred meters on either side of the level crossing on Bogan Road for the safety of all road users, until the site compound is removed in mid-2020
  • Traffic lights and stop/go signs will be used to assist drivers travelling on the temporary single lane
  • During the work there will be heavy vehicles travelling to and from the work sites.

Once rail has been installed in each section, the rail will be ‘live’ and construction trains will be intermittently passing across the level crossing. For your continued safety, please ensure you obey all signage at level crossings.

Work hours

Our standard working hours until mid-2020

  • 7am to 6pm Monday to Friday
  • 8am to 1pm Saturdays.

Intermittent out of hours works until mid-2020

  • 6am to 6pm Monday to Friday
  • 6am to 6pm Saturdays and Sundays.