Tumba Road Level Crossing upgrade

From 1 April 2022, our contractor Trans4m Rail will continue level crossing and drainage upgrade works near Tumba Road, north of Croppa Creek.

Snapshot

Date

April 2022 - July 2022

Working hours

7am to 6pm, seven days a week

Location

Tumba Road

Town
  • Croppa Creek
Local Government Area
  • Gwydir Shire

Work being done

Works will include installing new drainage structures and upgrades at level crossing 920.

To facilitate the works, a temporary gravel access road will be constructed to divert traffic, including road trains, around the existing level crossing.

Motorists are urged to follow changing traffic conditions on site, including speed zone reductions and directional traffic signage.

What can I expect

  • Trucks and other vehicles entering and exiting the construction site
  • Construction machinery and equipment operating on site adjacent to live traffic
  • Delivery of materials and equipment
  • Some of these works will be noisy and mitigation measures will be in place
  • Some minor traffic delays are expected during work hours.

Machinery used

  • Trucks,
  • cranes,
  • graders,
  • excavators,
  • loaders,
  • rollers and
  • water/vacuum excavation trucks

will be used within the construction impact zone.

How we’re managing impacts

  • Traffic control will be in place, where required
  • Water carts will be on site to wet down areas to assist in managing dust.

Contact

Phone: 1800 732 761

Email: inlandrailnsw@artc.com.au

Post: Inland Rail, GPO Box 14, Sydney NSW 2001